Digital Twins

The building, alive — from launch day to year thirty.

Most twins are a viewer handed over at the end. Ours opens the day the project goes to market and keeps working through every sale, every pour, every handover pack and every maintenance ticket for the life of the asset.

Follow the lifecycle Book a walkthrough
Lifecycle phases
Sales · Build · Handover · Operate
Delivery
Web-based, no install
Horizon
30+ years of operation
Scroll — the twin grows up

One model, four working lives

A Digital Twin doesn't begin at handover. It begins at launch — and it never ends.

The same coordinated model that sells an apartment off-plan is the model that shows the buyer their floor being poured, carries their snagging list on delivery day, and tells the facility manager which valve failed in year eleven. One dataset, four audiences, no re-modelling in between.

4Lifecycle phases
1Source of truth
0Re-modelling between them

Phase 01 — Sales & Marketing

Sell the building before it exists, with the model that will build it.

Developers lose deals in the gap between a render and a decision. The twin closes it: buyers explore the real masterplan, compare real units, see real availability, and leave with an interactive brochure instead of a PDF.

Immersive sales experience. Runs in the browser on the sales-suite touchscreen and on the buyer's phone — same build, same data. Slot · full-bleed video

Interactive masterplan — live availability

Hover a unit
Tower A
Tower B
Tower C
AvailableReservedSold

What the sales twin does

  • Interactive project presentation
  • Apartment & unit exploration
  • Interactive masterplans
  • Unit comparison
  • Real-time availability
  • Interactive brochures
  • Immersive sales experience
  • Web-based visualization
  • Customer engagement analytics
COMPARE 01

Unit A · Level 14

184 m² · 3 bed corner · marina aspect · Q3 2027. Balcony 22 m². Two parking bays.

COMPARE 02

Unit B · Level 09

142 m² · 2 bed · park aspect · Q3 2027. Balcony 14 m². One parking bay.

COMPARE 03

Unit C · Level 22

226 m² · 4 bed duplex · dual aspect · Q4 2027. Terrace 38 m². Three parking bays.

Phase 02 — Construction Progress

The moment a unit sells, the twin becomes a conversation.

Between contract and keys there are usually two years of silence broken by the occasional email. The twin turns that dead time into the strongest relationship a developer has: the buyer watches their own floor rise, with dated evidence behind every percentage.

Same camera, two dates. Every milestone stores its own pair, so any two months in the programme can be put side by side. Slot · before / after

Programme milestones

Substructure & piling

1,240 piles cast, pile-cap survey uploaded, as-built deviation folded back into the model.

Core to level 20

Slip-form core topped out three days ahead of the baseline programme.

Envelope & facade

Unitised panels installed to level 14. Weekly drone capture registered against the model.

Fit-out & commissioning

Delivery forecast recalculated nightly from actual progress, not from the original plan.

Client portal — Unit A · Level 14LIVE
0% Complete
against programme
Structure100%
Envelope72%
MEP first fix54%
Fit-out18%

Delivery forecast Q3 2027 — unchanged for 4 consecutive months.

Evidence, not adjectives

Drone footageMonthly
Site camerasContinuous
Progress photosWeekly
  • Live construction progress
  • Timeline milestones
  • Monthly updates
  • Progress photos
  • Drone footage
  • Site cameras
  • Percentage complete
  • Delivery forecasts
  • Client portal
  • Construction history

Phase 03 — Handover

Delivery day, without the box of paper.

Inspection, snagging, warranties, manuals and asset data all live on the element they describe. The buyer walks the unit with the twin open, taps the tap, and reads its own warranty. Nothing is filed anywhere else.

Unit inspection model. Drag to orbit. On phones and reduced-motion this falls back to the still automatically. Slot · .glb

Snagging record

SN-014Living room — skirting scuff, east wallClosed
SN-019Kitchen — cabinet door alignmentClosed
SN-023Bathroom 2 — extract fan noise levelWith contractor
SN-031Balcony — sealant bead, north cornerOpen

Each item is pinned to a coordinate in the model and carries its photo, its date, its owner and its closing evidence. The handover pack is the record, not a summary of it.

01

Handover documentation

O&M manuals, test certificates and as-built drawings attached to the element they belong to.

02

Warranty information

Every warranted product carries its start date, term and claim route. Expiries surface before they lapse.

03

Digital manuals

Plain-language guides for the resident, generated from the same asset data the FM team uses.

04

Equipment & asset data

Make, model, serial, install date, service interval — the spine that facility management runs on.

QR-code access, fixed to the thing itself

A code on the riser door, the AHU, the meter cupboard. Scan it and the twin opens on that asset — its manual, its warranty, its service history, its next inspection. No login hunt, no drawing number, no phone call.

Phase 04 — Facility Management

Then the long part: thirty years of running the building.

Ninety per cent of what a building costs is spent after it opens. This is where a twin either earns its keep or becomes a screensaver. Ours is wired to the systems that actually run the asset.

Operations dashboard24 SENSORS
Energy vs. baseline−14%
Planned maintenance on time96%
Space utilisation71%
Open work orders7

Thresholds raise a work order against the asset in the model, so the history stays where the next engineer will look for it.

Long-life capabilities

  • Facility Management
  • Asset Management
  • Preventive Maintenance
  • Space Management
  • IoT Integration
  • Sensor Data
  • Building Analytics
  • Energy Monitoring
  • Maintenance History
  • Operations Dashboard
  • Lifecycle Management

Maintenance history

Defects liability closed

All 312 items closed with evidence. Warranty register handed to the operator inside the twin.

AHU-03 bearing replaced

Flagged by vibration trend 6 weeks before failure. Part, cost and engineer recorded on the asset.

Lighting retrofit

Space model re-run; energy baseline reset; payback tracked against the actual meter, not the estimate.

Facade survey

Drone survey registered to the model. Panel-by-panel condition stored against the original install date.

Sensor network overlay. Live points rendered on the asset they monitor.Slot · video

The whole point

One digital platform from project launch to decades of building operation.

Not four tools stitched together at the end. One twin that grows up with the asset.

Bring your project into its twin.

Send us a model, a programme, or just a site address — we will show you what the first phase looks like.

Start a twin See the pipeline behind it